upgrade

3 jobs for master
Status Job ID Name Coverage
  Build
canceled #322
build

 
  Test
canceled #324
allowed to fail
code_quality

canceled #323
test

 

Speed up your pipelines with Needs relationships

Using the needs keyword makes jobs run before their stage is reached. Jobs run as soon as their needs relationships are met, which speeds up your pipelines.

If you add needs to jobs in your pipeline you'll be able to view the needs relationships between jobs in this tab as a Directed Acyclic Graph (DAG).

There are no tests to show.